• ISO 9001Certification
  • 24/7Service
  • QualifiedProfessionals

My Spread Forum Qualification Testing of Drill Pipe

  • Standard:ASTM, ASME, AISI, GB, JIS, DIN, EN, BS
  • Certification:ISO, SGS, RoHS, CE, IBR
  • Production Capacity: 50000 tons Per Month
  • Description:My-Spread Forum Qualification Testing of Drill Pipe ...Apr 15, 2015A client asked about using an insert style drill pipe float valve contained in an appropriate sub in a liner or casing string instead of a cement float collar. It is an un-cemented application. Their client is asking for the valve to be to API 10F, the cementing equipment re ...
  • Email: [email protected]
Online Chat Leave a Message

My Spread Forum Qualification Testing of Drill Pipe Description

A bit of information about water wells Santa Fe New My Spread Forum Qualification Testing of Drill Pipe

After the 10-inch casing was in, the crew switched to an eight-and-a-half-inch bit to drill the rest of the 500-foot hole, adding 20-foot sections of drill pipe as they went.API - RP 7G-2 - Inspection and Classification of Used My Spread Forum Qualification Testing of Drill Pipe This standard specifies the required inspection for each level of inspection, procedures for the inspection, and testing of used drill stem elements. For the purposes of this standard, drill stem elements include drill pipe body, tool joints, rotary shouldered connections, drill collar, heavy-weight drill pipe (HWDP), and the ends of drill stem My Spread Forum Qualification Testing of Drill Pipe API 5A5 2005 INC ERR 1 2009 R2010 FIELD My Spread Forum Qualification Testing of Drill Pipe bulletin on performance properties of casing, tubing and drill pipe api 5a3 2011 recommended practice on thread compounds for casing, tubing, line pipe, and drill stem elements iso 11484 2009(r2015) steel products - employer's qualification system for non-destructive testing

API 5A5 2005 FIELD INSPECTION OF NEW CASING, TUBING,

bulletin on performance properties of casing, tubing and drill pipe api 5a3 2011 recommended practice on thread compounds for casing, tubing, line pipe, and drill stem elements iso 11484 2009(r2015) steel products - employer's qualification system for non-destructive testing API 5D 2001 SPECIFICATION FOR DRILL PIPE SAI Global10.10 Certification and Qualification of Personnel 10.11 Evaluation of Indications (Prove-up) 10.12 Disposition My Spread Forum Qualification Testing of Drill Pipe 10 Drill Pipe Upset Maximum Permissible Depth of Imperfections My Spread Forum Qualification Testing of Drill Pipe PRACTICE FOR ULTRASONIC TESTING OF METAL PIPE AND TUBING ASTM A 751 2014-04 TEST METHODS, PRACTICES, AND TERMINOLOGY FOR CHEMICAL ANALYSIS OF STEEL PRODUCTS My Spread Forum Qualification Testing of Drill Pipe API RP 5A5 - Field Inspection of New Casing, Tubing, and My Spread Forum Qualification Testing of Drill Pipe 200 Massachusetts Avenue NW Suite 1100 Washington, DC 20001-5571 United States

API SC5 Ballot Submission Task Group on Drill Stem

drill pipe drill pipe body with weld-on tool joints 3.1.4 drill pipe body seamless pipe with upset ends 3.1.5 drill pipe body manufacturer firm, company or corporation that operates facilities for making the drill pipe body and is responsible for compliance with the requirements of this standard 3.1.6 drill pipe Aleksey Bobylev - Sr. Quality Technician - Cameron, a My Spread Forum Qualification Testing of Drill Pipe Third Party Monitoring of Drill Pipe Inspection, Mud Motor Inspection, and other specialty/down hole tools. Companys worked for but not limited to, Chevron, Shell, Conoco Phillips My Spread Forum Qualification Testing of Drill Pipe Author Ian Silvester, Tore Høgset, Steinar Torvund, Subodh SaxenaPublish Year 2020My-Spread Forum Pumping alignment for Formation My Spread Forum Qualification Testing of Drill Pipe Aug 05, 2016My-Spread my profile about My Spread Forum Qualification Testing of Drill Pipe What are the positives and negatives to perform formation integrity test pumping thru both drill pipe and annular, if the line up allow you to do so?? What is the benefit against pumping only thru the drill pipe-BHA. Thanks. Share. 2 answer(s)

Ben Bennetzen - President / Lead Consultant - OFT My Spread Forum Qualification Testing of Drill Pipe

Experienced inspector of tubular drilling products such as drill pipes, bottom hole assembly, casing, tubing and specialty tools as per DS-1®, NS-2®, API&and manufacturer standards.Development and Manufacture of Cost Effective Composite My Spread Forum Qualification Testing of Drill Pipe The report presents progress made from October 1, 2005 through September 30, 2006 and contains the following discussions Qualification Testing; Prototype Development and Testing of ''Smart Design'' Configuration; Field Test Demonstration; Development of Ultra-Short Radius Composite Drill Pipe (USR-CDP); and Development of Smart USR-CDP.Drill Pipe Failure Analysis - G2MT LaboratoriesDrill pipe and casing failures are one of the most common types we receive for failure analysis. G2MT has performed numerous failure analysis on drill pipe and joint sections from drill strings around the US and abroad. Improper processing and/or storage resulted in early corrosion and failures in

Drill Pipe Inspections Turnco Drilling Tool Inspections

Drill Pipe Inspections. At Turnco, we provide drilling tool and drill pipe inspection services with a focus on downhole assembly equipment. We bring inspection expertise to every job through services that include Magnetic Particle Testing (MT) and Liquid Penetrant Testing (PT) services as well as advanced Ultrasonic Testing (UT) and EMI.Drill Pipe inspection - NDT.net - Nondestructive Testing My Spread Forum Qualification Testing of Drill Pipe Dec 10, 201414:15 Oct-20-2014 Drill Pipe inspection. For the internal coating of the Drill pipe. There are 4 conditions as per DS-1. I need to know when making assessment of the Internal coating, do we take into consideration the Internal coating of the tool joint. Drill Pipe inspection - NDT.net - Nondestructive Testing My Spread Forum Qualification Testing of Drill Pipe Dec 10, 201414:15 Oct-20-2014 Drill Pipe inspection. For the internal coating of the Drill pipe. There are 4 conditions as per DS-1. I need to know when making assessment of the Internal coating, do we take into consideration the Internal coating of the tool joint.

How to Pass the IWCF Supervisor Well Control Exam The My Spread Forum Qualification Testing of Drill Pipe

This occurs when the pump rate, casing pressure, drill pipe pressure, etc. are all were they are supposed to be. On my test, 3 of the 10 correct answers on my IWCF Level 4 exam where everything is OK. General Theory and Knowledge Questions Another large component of the P&P exam is general theory and knowledge questions about well control.ISO Standards 2020 update for use in the Oil & Gas My Spread Forum Qualification Testing of Drill Pipe Qualification testing for coating under insulation (New) 35 ISO 20321 Powered elevators (New) 36 My Spread Forum Qualification Testing of Drill Pipe tubing and plain end drill pipe 170 ISO 15464 Gauging and inspection of threads 171 My Spread Forum Qualification Testing of Drill Pipe If you like it then spread my words by sharing posts on your social media profiles. About Me. Naveed Ahmed Hi! Welcome to my Industry-leading LFS-5 Shear Ram upgrades and Shear This extreme condition test demonstrates the superior performance and reliability of the design. Testing has proven the capability of this shear ram design with consecutive shearing of the following pipes all performed on the same set of shear rams 5-", 27 ppf, 0.440" wall, S-135 Drill Pipe

Login Register my profile about Spread member organisations invite my friends useful linksQualification & Testing of a Powered Wired Drill Pipe My Spread Forum Qualification Testing of Drill Pipe

Abstract This paper documents the development, qualification and field test deployment of an electrically powered and wired drill pipe system for use by operators, drillers and service companies in oil & gas drilling operations. Deployment of thMy-Spread Forum Connection times and practicesSingling in (involves picking up pipe) Singling out (involves laying out pipe) We are being told that 3" minutes on a jack-up (non-automated because PRS not working; block-retract not being used because Drilling Co refuses to do so; with 5"" XT55 drillpipe) is good, but we disagree.My-Spread Forum Drill pipe screens for XT-54 pipeSep 28, 2011Drill pipe screens for XT-54 pipe 28 September 2011 We're using 5-1/2" XT-54 drill pipe on our rigs in Kazakhstan, and over the last couple of years have had a two instances of large amounts of debris getting into - and completely plugging - the MWD/LWD tools, having bypassed all the suction and discharge screens on the mud pumps.

My-Spread Forum Float Sub removal

My-Spread my profile about My Spread Forum Qualification Testing of Drill Pipe In my experience the valves are not difficult to remove IF they are removed when the sub is fresh out of the hole, and the mud is still warm . My Spread Forum Qualification Testing of Drill Pipe 13-3/8" Double valve Autofill type TOPCO float shoe Float Collar Qualification Testing of Drill Pipe Float Valves Plunger vs. Flapper Float Valves Jump to top of the My Spread Forum Qualification Testing of Drill Pipe My-Spread Forum Home pageWelcome to My-Spread, the Worlds Premier Drilling Forum Over the past decade, My-Spread has grown to become the leading oil and gas drilling forum for technical Q&A engineering discussions. The site started with a core team of contributors covering all main specialist areas involved in drilling, exploration, subsea, completion and abandonment My Spread Forum Qualification Testing of Drill Pipe My-Spread Forum Qualification Testing of Drill Pipe My Spread Forum Qualification Testing of Drill Pipe Apr 15, 2015A client asked about using an insert style drill pipe float valve contained in an appropriate sub in a liner or casing string instead of a cement float collar. It is an un-cemented application. Their client is asking for the valve to be to API 10F, the cementing equipment recommended qualification and testing standard, but this does not cover My Spread Forum Qualification Testing of Drill Pipe

OIL COUNTRY TUBULAR GOODS Drill ipe-based

clear-cut as for drill pipe. Drill pipe ben-efits from very detailed inspection crite-ria, as outlined in API RP7G-2 or other industry standards, such DS1 or NS1. While there are numerous qualified inspection companies for drill pipe-based products, there are just a few companies that specialize in Offshore roustabout My World of WorkQualifications and experience working with shipbuilding, construction or engineering is helpful. Once in a job you may be able to gain relevant Scottish Vocational Qualifications such as the Offshore Drilling Operations (SVQ levels 1/2/3) developed with Offshore Petroleum Industry Training Organisation (OPITO) or a qualification through the My Spread Forum Qualification Testing of Drill Pipe Oil & Gas Calculations Lite - Apps on Google PlaySimplified Handy application for Oil & Gas Correlations & Calculations. Must-have tool for all Oil & Gas Professionals and Engineers. Features Pipe Design, Cementing, Drilling Mudding, Drill Pipe, Mud Pumps, Reservoir Engineering, Rock-Fluid Properties, Mechanical Design, Formation Evaluation, Well Logging, Oil and Gas units, Oil Field units, Unit Convertor. Please email us on support My Spread Forum Qualification Testing of Drill Pipe

Pipeline welding

Sep 25, 2008I am using 1/8" 6010 for the root. I am using two different test procedures in my "homeschooling". The first is the standard 90 degree branch test used by most pipeline companies. Although I could not get 12" pipe locally, I did find some clean 8" pipe at the local recycling center.Premium Connection - API Coupling, Casing Pipe, Tubing My Spread Forum Qualification Testing of Drill Pipe A large diameter (> 16 in.) pipe improves the stab-in and makeup characteristics; galling should be reduced (particularly in CRA applications and tubing strings that will be re-used); and connection failure under high torsional loads (e.g., while rotating pipe) should be prevented.Procedures for Inspection, Maintenance, Repair, and My Spread Forum Qualification Testing of Drill Pipe ADDENDUM 1 TO PROCEDURES FOR INSPECTION, MAINTENANCE, REPAIR, AND REMANUFACTURE OF DRILLING EQUIPMENT 3 C.3.7 The user shall also ensure that procedures for utilizing features designed to control the top of the BOP stack are imple- mented until either the moonpool guidance system described in C.3.6 (if provided) is engaged, and / or the BOP stack is sus- My Spread Forum Qualification Testing of Drill Pipe

Some results are removed in response to a notice of local law requirement. For more information, please see here.Updated list of API and ISO Standards for Tubulars My Spread Forum Qualification Testing of Drill Pipe

Oct 17, 2017This International Standard covers the following grades of drill-pipe grade E drill-pipe; high-strength grades of drill-pipe, grades X, G, and S. This International Standard can also be used for drill-pipe with tool joints not specified by ISO or API standards. This International Standard is based on Spec 5D and Spec 7.Stephen Burkland - Quality Assurance Consultant My Spread Forum Qualification Testing of Drill Pipe - Mill Surveillance of Drill Pipe Manufacture - Casing, Tubing, and Completions Equipment assessment - Qualification of Landing String Components, Handling Equipment, & Lifting Equipment Quality My Spread Forum Qualification Testing of Drill Pipe Tensile Test Failure in Weld Metal - Eng-Tips ForumsDear All In tensile test, Failure or Break should occur in Base Metal, because the Weld Metal shall have greater strength than weld metal. But, when i searching in some reference and even occur in my fabrication, failure could be located in Weld Metal and the result was OK (acceptable) What limitation and criteria so failure on Weld Metal in Tensile Test can be acceptable??

Thermal Grout, HDD Make 6,200-Foot Electrical Transmission My Spread Forum Qualification Testing of Drill Pipe

Each rig spread included mud systems, mud pumps, drill pipe tooling, and other support equipment. Further, the bay crossing was not a typical HDD installation. We installed approximately 220 feet of 60-inch conductor casing under the Florida Avenue substation at the south end of the crossing to protect the active substation from impacts of My Spread Forum Qualification Testing of Drill Pipe Title Actively seeking new opportunitiesLocation Houston, Texas500+ connectionsSome results are removed in response to a notice of local law requirement. For more information, please see here.Title Customer Representative Quality Location Houston, TexasConnections 221TN 27 Frequently Asked Questions - HDPE Pipe for Yes, small diameter HDPE pipe products are available in both inside diameter controlled (SIDR) and copper tube size outside diameter controlled (CTS-SDR). Typically, SIDR pipe is available from ½-inch to 3-inch diameter while copper tube size products are typically available in sizes ¾-inch to 2-inch.

Title Senior Quality TechnicianLocation Houston, TexasConnections 306drill pipe price, drill pipe price Suppliers and My Spread Forum Qualification Testing of Drill Pipe

2,052 drill pipe price products are offered for sale by suppliers on , of which mining machinery parts accounts for 20%, steel pipes accounts for 12%, and plastic tubes accounts for 1%. A wide variety of drill pipe price options are available to you, such as drill pipe, drill bit, and stabilizer.Wellbore cleanups; the oilfields longest running drama My Spread Forum Qualification Testing of Drill Pipe May 29, 2017It also started the water-wetting process on the pipe that enabled loosely attached solids to be moved out of the well with flowrate. The cleaning spacer was pure chemistry in a turbulent flow regime. The actual amount of chemical was determined via testing in the lab. We would usually test 5-20% concentrations at various bob speeds to land on My Spread Forum Qualification Testing of Drill Pipe how to get a job at halliburton IndeedNov 28, 2008I will continue to search on my end. The profile on the indeed website just doesnt reflect my exoerience in the oil and gas field industry since the 80's. Drill pipe inspector, Blow out prevention, Power Tong operator, helped Halliburton in cementing proceedures, pressure testing of casing and drill outs of drill pipe filled with cement.

20 YEARS OF EXPERIENCE IN STEEL PRODUCTION

Our Factory Workshop

Steel Plates Production Line
Steel Plates Production Line
Steel Plates Production Line
Steel Plates Production Line
Steel Pipes Production Line
Steel Pipes Production Line
Steel Coils Production Line
Steel Coils Production Line
Steel Plates Warehouse
Steel Plates Warehouse
Steels Machining Center
Steels Machining Center
Steel Deep Processing Center
Steel Deep Processing Center
Cutting and welding center
Cutting and welding center

Contact Information

  • 118 Kexue Road, Zhengzhou City, Henan Province, China
  • [email protected]
  • 0086-13569929107

Opening Hours

  • Monday / Tuesday 8:30 AM to 6:00 PM
  • Wednesday / Thursday 8:00 AM to 6:30 PM
  • Friday / Saturday 8:30 AM to 7:00 PM
  • Sunday Close

Get in Touch With Us

Complete control over products allows us to ensure our customers receive the best quality prices and service. Your email address will not be published.

Henan Seamless Steel Tubes Factory

Our Main product included Steel Plates, Steel pipes, Steel coils, Steel Section and Steel sheets, which are largely sell to Europe, South and North America, Asia, Africa, Middle-east, Southeast Asia.

Headquaters

  • 118 Kexue Road, Zhengzhou City, Henan Province, China
  • [email protected]
  • 0086-13569929107
  • 0086-13569929107

Leave a Message

If you have any need steel products, please leave you message.

* Don't worry, we don't spam.